3D Modelling
The proposed office development comprises a total Built-Up Area (BUA) of 289,805.27 ft², incorporating office, retail, service, and circulation spaces across multiple levels. The project is designed to maximise space efficiency while meeting all planning and GFA requirements.
SUREBIM Scope
SUREBIM is providing ongoing BIM modelling of the MEP systems, including coordination and clash resolution, while developing the models from LOD 200 to LOD 400 in Autodesk Revit. The scope includes coordinated BIM models, drawing production, clash detection, and construction documentation. The project will also incorporate 3D laser scanning and as-built model validation as part of the final delivery phase.







